KCC carries out regular inspection and maintenance of silt curtain systems during marine construction works to ensure they remain effective throughout the works programme. Damaged or displaced silt curtains are repaired or replaced promptly to maintain environmental protection.
Silt curtains are the primary physical barrier preventing turbid water from spreading beyond the works area. Regular inspection and maintenance ensures they remain effective — protecting water quality and demonstrating compliance with EPD requirements.
Turbidity Monitoring
Continuous and event-triggered turbidity monitoring at designated stations during marine construction.
Water Quality Sampling
Periodic water quality sampling and analysis at designated stations during marine construction.
Monthly EM&A Reporting
Preparation and submission of monthly environmental monitoring and audit reports to EPD.
Part of
Environmental Monitoring
KCC provides specialist environmental monitoring services for marine construction projects — from tu
View all Environmental Monitoring servicesIMCA · ADCI · HSE · HKCP Compliant
All diving operations conducted to IMCA, ADCI, HSE & HKCP standards
Our team is ready to discuss your project requirements and provide a detailed proposal.